Full rewiring
Aluminium wiring from the 1980s, two breakers for a whole flat, no earthing. Replacement with copper, new circuits, inspection report.
Electrical work across Czechia
In Czechia, only a person certified under Decree 250/2021 Coll. may work on electrical installations. Tell us what you need — we reply within 24 hours and arrange someone who holds that certification.
Aluminium wiring from the 1980s, two breakers for a whole flat, no earthing. Replacement with copper, new circuits, inspection report.
Replacing an old consumer unit, adding an RCD or surge protection. Required if you are adding an induction hob, heat pump or EV charger.
Extra kitchen circuit, outdoor socket, moving switches after a renovation. Small jobs that larger firms have no time for.
Initial inspection after new work, periodic inspection for a building or company, inspection before selling a property. With a report insurers accept.
Supply line for a wallbox, protection, inverter connection. The electrician checks whether your existing supply has enough capacity.
Tripping breaker, short circuit, dead circuit, burning smell from the switchboard. Write what is happening — for emergencies we call back right away.
Three steps, no registration.
A few sentences and your town is enough. A photo of the switchboard helps estimate the scope before anyone drives out.
We call, ask for details and arrange an electrician certified for this type of work who has capacity.
The electrician contacts you and arranges a survey or a date. The contract and payment are directly between you and them.
Typical ranges in Czechia in 2026. The exact price comes from the electrician after a survey — with electrical work it cannot honestly be promised remotely.
| Work | Typically |
|---|---|
| Electrician hourly rate | CZK 500–900 |
| Call-out (outside town) | CZK 300–800 |
| New socket including chasing | CZK 800–2,000 |
| Replacing a flat switchboard | CZK 8,000–25,000 |
| Full rewiring of a 3-bedroom flat | CZK 90,000–180,000 |
| Initial inspection report | CZK 2,500–6,000 |
| Supply line for an EV charger | CZK 6,000–20,000 |
Excluding materials and VAT. Emergencies and weekend work carry a surcharge.
Write it in your own words, in English or Czech. We reply within 24 hours — emergencies right away.
Nothing. The request is free and non-binding for you. The electrician pays us a commission for the introduction. You agree the price and the contract directly with them.
Yes. Only a person qualified under Decree 250/2021 Coll. may work on electrical installations in Czechia, and only an inspector certified by TIČR may issue an inspection report. Work done by an uncertified person can void your insurance if a fire occurs.
After new or substantially altered wiring, yes. The distribution operator requires it for connection, the building authority for approval, and the insurer if you make a claim. Getting it retroactively is harder and usually costs more.
Yes, we take requests from the whole country. In smaller towns arranging someone can take longer than a day — we will always tell you where things stand rather than leaving you waiting.
With us, yes. We will tell the electrician in advance that you prefer English and match you with someone who can handle it, or we translate the key points ourselves.